ITAC Assessment: UD0213
ITAC logo
ITAC Assessment: UD0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 266
Plant Area
n/a
Annual Production 1,335
ton
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $445,469 9,191,090
kWh
Natural Gas $383,355 76,651
MMBtu
LPG $91,669 23,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $14,229 $20,000 $14,229
613,423
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,000 $10,000 $14,564
346,131
kWh
$(-1,352.0)
-
MMBtu
$(-212.0)
03 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $45,881 $100,000 - $45,881
-
MMBtu
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,036 $2,000 $1,429
36,635
kWh
$(-393.0)
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $6,181 $15,000 - $6,181
-
MMBtu
-
TOTAL RECOMMENDED $80,327 $147,000 $30,222
996,189
kWh
$50,317
-
MMBtu
$(-212.0)
TOTAL IMPLEMENTED $34,446 $47,000 $30,222
996,189
kWh
$4,436
-
MMBtu
$(-212.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs