ITAC Assessment: UD0212
ITAC logo
ITAC Assessment: UD0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FROZEN MEAT PATTIES
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 142
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,588 3,227,140
kWh
Natural Gas $114,407 23,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,241

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,241 $1,000 - $2,241
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $34,293 $90,000 - $34,293
-
MMBtu
04 2.3191: Use demand controller or load shedder $5,670 $18,000 $5,670
-
kWh
-
TOTAL RECOMMENDED $42,204 $109,000 $5,670
-
kWh
$36,534
-
MMBtu
TOTAL IMPLEMENTED $2,241 $1,000 - $2,241
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs