ITAC Assessment: UD0211
ITAC logo
ITAC Assessment: UD0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product GRAPHIC ARTS MACHINERY
NAICS
n/a
SIC 3554: Paper Industries Machinery
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,930 1,941,090
kWh
Natural Gas $35,738 7,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,084 - $6,124
-
kWh
- $(-1,040.0)
02 2.7261: Install timers and/or thermostats $7,453 $2,739 $1,361
26,084
kWh
$6,092
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $2,650 $8,000 $3,829
88,218
kWh
$(-1,179.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,842 - $3,311
80,598
kWh
$(-993.0)
-
MMBtu
$524
TOTAL RECOMMENDED $18,029 $10,739 $14,625
194,900
kWh
$3,920
-
MMBtu
$(-516.0)
TOTAL IMPLEMENTED $7,926 - $9,435
80,598
kWh
$(-993.0)
-
MMBtu
$(-516.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs