| Assessment Year | 1986 |
|---|---|
| Principal Product | AUTOMOTIVE TRIM |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 364 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $399,688 | 6,043,083 |
kWh
|
$0.066 |
| Natural Gas | $99,697 | 21,138 |
MMBtu
|
$4.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,917 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,692 | $708 |
$15,692
-
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,886 | $5,000 |
$5,886
89,977
kWh
|
- | - | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $13,480 | $52,200 | - |
$13,480
-
MMBtu
|
- | |
| 04 | 2.7494: Install storm windows and doors | $6,617 | $6,040 | - |
$6,617
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,237 | $12,000 |
$2,544
42,790
kWh
|
$(-297.0)
-
MMBtu
|
$1,990 | |
| 06 | 2.2437: Recover waste heat from equipment | $5,622 | $11,000 | - |
$5,622
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $51,534 | $86,948 |
$24,122
132,767
kWh
|
$25,422
-
MMBtu
|
$1,990 | ||
| TOTAL IMPLEMENTED | $44,917 | $80,908 |
$24,122
132,767
kWh
|
$18,805
-
MMBtu
|
$1,990 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs