ITAC Assessment: UD0205
ITAC logo
ITAC Assessment: UD0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product AUTOMOTIVE TRIM
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 364
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,688 6,043,083
kWh
Natural Gas $99,697 21,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,692 $708 $15,692
-
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,886 $5,000 $5,886
89,977
kWh
- -
03 2.7492: Use proper thickness of insulation on building envelope $13,480 $52,200 - $13,480
-
MMBtu
-
04 2.7494: Install storm windows and doors $6,617 $6,040 - $6,617
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,237 $12,000 $2,544
42,790
kWh
$(-297.0)
-
MMBtu
$1,990
06 2.2437: Recover waste heat from equipment $5,622 $11,000 - $5,622
-
MMBtu
-
TOTAL RECOMMENDED $51,534 $86,948 $24,122
132,767
kWh
$25,422
-
MMBtu
$1,990
TOTAL IMPLEMENTED $44,917 $80,908 $24,122
132,767
kWh
$18,805
-
MMBtu
$1,990
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs