Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLASTIC BAGS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,298 9,991,794
kWh
Natural Gas $42,510 8,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $50,748 $78,500 $85,146
1,541,618
kWh
$(-34,398.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,483 $1,804 $3,845
89,097
kWh
$(-594.0)
-
MMBtu
$232
TOTAL RECOMMENDED $54,231 $80,304 $88,991
1,630,715
kWh
$(-34,992.0)
-
MMBtu
$232
TOTAL IMPLEMENTED $54,231 $80,304 $88,991
1,630,715
kWh
$(-34,992.0)
-
MMBtu
$232
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs