ITAC Assessment: UD0190
ITAC logo
ITAC Assessment: UD0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PRECISION MEASURING INSTRUMENTS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $452,217 8,949,883
kWh
Natural Gas $98,085 17,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,737 - $12,257
-
kWh
- $(-520.0)
02 2.4322: Use or replace with energy efficient substitutes $4,588 $10,000 $4,588
115,768
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $18,491 $38,950 $18,491
270,809
kWh
- -
04 2.7492: Use proper thickness of insulation on building envelope $3,631 $10,070 - $3,631
-
MMBtu
-
TOTAL RECOMMENDED $38,447 $59,020 $35,336
386,577
kWh
$3,631
-
MMBtu
$(-520.0)
TOTAL IMPLEMENTED $3,631 $10,070 - $3,631
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs