ITAC Assessment: UD0182
ITAC logo
ITAC Assessment: UD0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product VALVES,BLOWERS,HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,840
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $544,646 8,643,904
kWh
Natural Gas $195,632 35,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $233,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $211,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $153,020 $24,416 $138,691
2,842,321
kWh
$10,753
-
MMBtu
$3,576
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,436 - $8,436
-
kWh
- -
03 2.2514: Cover open tanks $8,435 $1,100 - $8,435
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,277 $50,700 $23,068
381,594
kWh
$(-4,791.0)
-
MMBtu
-
05 2.2221: Use immersion heating in tanks, melting pots, etc $2,860 $1,300 $(-2,620.0)
(-99,648)
kWh
$5,480
-
MMBtu
-
06 3.4151: Minimize water usage $38,577 $4,000 - - $38,577
07 2.2414: Use waste heat from hot flue gases to preheat $3,516 $2,500 - $3,516
-
MMBtu
-
TOTAL RECOMMENDED $233,121 $84,016 $167,575
3,124,267
kWh
$23,393
-
MMBtu
$42,153
TOTAL IMPLEMENTED $211,984 $32,016 $147,127
2,842,321
kWh
$22,704
-
MMBtu
$42,153
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs