| Assessment Year | 1985 |
|---|---|
| Principal Product | VALVES,BLOWERS,HEAT EXCHANGERS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,840
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $544,646 | 8,643,904 |
kWh
|
$0.063 |
| Natural Gas | $195,632 | 35,414 |
MMBtu
|
$5.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $233,121 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $211,984 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $153,020 | $24,416 |
$138,691
2,842,321
kWh
|
$10,753
-
MMBtu
|
$3,576 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,436 | - |
$8,436
-
kWh
|
- | - | |
| 03 | 2.2514: Cover open tanks | $8,435 | $1,100 | - |
$8,435
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,277 | $50,700 |
$23,068
381,594
kWh
|
$(-4,791.0)
-
MMBtu
|
- | |
| 05 | 2.2221: Use immersion heating in tanks, melting pots, etc | $2,860 | $1,300 |
$(-2,620.0)
(-99,648)
kWh
|
$5,480
-
MMBtu
|
- | |
| 06 | 3.4151: Minimize water usage | $38,577 | $4,000 | - | - | $38,577 | |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $3,516 | $2,500 | - |
$3,516
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $233,121 | $84,016 |
$167,575
3,124,267
kWh
|
$23,393
-
MMBtu
|
$42,153 | ||
| TOTAL IMPLEMENTED | $211,984 | $32,016 |
$147,127
2,842,321
kWh
|
$22,704
-
MMBtu
|
$42,153 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs