ITAC Assessment: UD0180
ITAC logo
ITAC Assessment: UD0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area
n/a
Annual Production 1,100
Tgal
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,001 1,133,939
kWh
Natural Gas $37,355 5,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5194: Redesign process $5,475 - - - $5,475
02 2.2444: Use hot process fluids to preheat incoming process fluids $2,995 $10,000 - $1,893
-
MMBtu
$1,102
03 2.2113: Repair or replace steam traps $1,559 $2,500 - $1,559
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $2,008 $4,000 - $2,008
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $657 $700 $657
7,913
kWh
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,822 - $6,822
(-4,103)
kWh
- -
TOTAL RECOMMENDED $19,516 $17,200 $7,479
3,810
kWh
$5,460
-
MMBtu
$6,577
TOTAL IMPLEMENTED $12,694 $17,200 $657
7,913
kWh
$5,460
-
MMBtu
$6,577
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs