ITAC Assessment: UD0179
ITAC logo
ITAC Assessment: UD0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ALUMINUM DIE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,291 3,091,442
kWh
Natural Gas $336,370 72,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,310 - $8,310
152,696
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,449 $31,200 $15,938
309,203
kWh
$(-1,489.0)
-
MMBtu
03 2.6122: Adjust vents to minimize energy use $3,925 $1,500 - $3,925
-
MMBtu
04 2.4322: Use or replace with energy efficient substitutes $124,795 $3,650 $1,825
33,118
kWh
$122,970
-
MMBtu
05 2.2444: Use hot process fluids to preheat incoming process fluids $7,723 $15,000 - $7,723
-
MMBtu
TOTAL RECOMMENDED $159,202 $51,350 $26,073
495,017
kWh
$133,129
-
MMBtu
TOTAL IMPLEMENTED $26,684 $32,700 $24,248
461,899
kWh
$2,436
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs