| Assessment Year | 1985 |
|---|---|
| Principal Product | ALUMINUM DIE CASTINGS |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $202,291 | 3,091,442 |
kWh
|
$0.065 |
| Natural Gas | $336,370 | 72,472 |
MMBtu
|
$4.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $159,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,684 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,310 | - |
$8,310
152,696
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,449 | $31,200 |
$15,938
309,203
kWh
|
$(-1,489.0)
-
MMBtu
|
|
| 03 | 2.6122: Adjust vents to minimize energy use | $3,925 | $1,500 | - |
$3,925
-
MMBtu
|
|
| 04 | 2.4322: Use or replace with energy efficient substitutes | $124,795 | $3,650 |
$1,825
33,118
kWh
|
$122,970
-
MMBtu
|
|
| 05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $7,723 | $15,000 | - |
$7,723
-
MMBtu
|
|
| TOTAL RECOMMENDED | $159,202 | $51,350 |
$26,073
495,017
kWh
|
$133,129
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,684 | $32,700 |
$24,248
461,899
kWh
|
$2,436
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs