ITAC Assessment: UD0178
ITAC logo
ITAC Assessment: UD0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BRASS PLUMBING PRODUCTS
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,115
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,138 3,004,689
kWh
Natural Gas $72,332 14,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $2,265 $740 - $2,265
-
MMBtu
-
02 2.2444: Use hot process fluids to preheat incoming process fluids $3,261 $3,000 $80
879
kWh
- $3,181
03 2.7292: Lower ceiling to reduce conditioned space $414 $1,250 - $414
-
MMBtu
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,380 $100 - $1,380
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $262 $225 $310
3,517
kWh
$(-48.0)
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $114 $150 - $114
-
MMBtu
-
TOTAL RECOMMENDED $7,696 $5,465 $390
4,396
kWh
$4,125
-
MMBtu
$3,181
TOTAL IMPLEMENTED $114 $150 - $114
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs