ITAC Assessment: UD0173
ITAC logo
ITAC Assessment: UD0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COPPER
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 159
Plant Area
n/a
Annual Production 25,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,479 4,461,606
kWh
Natural Gas $35,557 5,346
MMBtu
Fuel Oil #2 $2,800 402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,989 $21,000 $26,637
486,225
kWh
$(-7,648.0)
-
MMBtu
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,721 $400 $1,721
68,581
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $30,858 $1,000 $30,858
-
kWh
-
TOTAL RECOMMENDED $51,568 $22,400 $59,216
554,806
kWh
$(-7,648.0)
-
MMBtu
TOTAL IMPLEMENTED $51,568 $22,400 $59,216
554,806
kWh
$(-7,648.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs