ITAC Assessment: UD0171
ITAC logo
ITAC Assessment: UD0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SOAP PADS,FABRIC SOFTENER
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 4,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,253 5,756,448
kWh
Natural Gas $385,232 69,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $7,352 $4,773 - $7,352
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $14,014 $17,000 - $14,014
-
MMBtu
-
03 2.2444: Use hot process fluids to preheat incoming process fluids $10,662 $38,000 - $10,662
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,744 $12,000 $1,547
30,481
kWh
$(-407.0)
-
MMBtu
$2,604
TOTAL RECOMMENDED $35,772 $71,773 $1,547
30,481
kWh
$31,621
-
MMBtu
$2,604
TOTAL IMPLEMENTED $21,366 $21,773 - $21,366
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs