ITAC Assessment: UD0165
ITAC logo
ITAC Assessment: UD0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product REFRACTORY PRODUCTS
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,370 6,228,898
kWh
Natural Gas $486,720 87,871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $33,571 $100,000 - $33,571
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $11,520 $21,000 - $11,520
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $2,623 $250 $2,623
9,086
kWh
-
04 2.2437: Recover waste heat from equipment $1,135 $2,000 - $1,135
-
MMBtu
05 2.2437: Recover waste heat from equipment $2,934 $4,600 - $2,934
-
MMBtu
06 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,435 - $263
10,258
kWh
$3,172
-
MMBtu
07 2.3191: Use demand controller or load shedder $4,848 $1,500 $4,848
-
kWh
-
TOTAL RECOMMENDED $60,066 $129,350 $7,734
19,344
kWh
$52,332
-
MMBtu
TOTAL IMPLEMENTED $12,352 $8,100 $5,111
10,258
kWh
$7,241
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs