| Assessment Year | 1985 |
|---|---|
| Principal Product | REFRACTORY PRODUCTS |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $349,370 | 6,228,898 |
kWh
|
$0.056 |
| Natural Gas | $486,720 | 87,871 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,352 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $33,571 | $100,000 | - |
$33,571
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $11,520 | $21,000 | - |
$11,520
-
MMBtu
|
|
| 03 | 2.4239: Eliminate or reduce compressed air usage | $2,623 | $250 |
$2,623
9,086
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,135 | $2,000 | - |
$1,135
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $2,934 | $4,600 | - |
$2,934
-
MMBtu
|
|
| 06 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $3,435 | - |
$263
10,258
kWh
|
$3,172
-
MMBtu
|
|
| 07 | 2.3191: Use demand controller or load shedder | $4,848 | $1,500 |
$4,848
-
kWh
|
- | |
| TOTAL RECOMMENDED | $60,066 | $129,350 |
$7,734
19,344
kWh
|
$52,332
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,352 | $8,100 |
$5,111
10,258
kWh
|
$7,241
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs