| Assessment Year | 1985 |
|---|---|
| Principal Product | INDUSTRIAL COATING |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 16 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,944 | 296,014 |
kWh
|
$0.11 |
| Natural Gas | $5,778 | 1,051 |
MMBtu
|
$5.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,678 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,678 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,221 | $2,000 | - |
$1,221
-
MMBtu
|
|
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,360 | - |
$2,360
-
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $765 | $276 |
$925
10,844
kWh
|
$(-160.0)
-
MMBtu
|
|
| 04 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $332 | $300 | - |
$332
-
MMBtu
|
|
| TOTAL RECOMMENDED | $4,678 | $2,576 |
$3,285
10,844
kWh
|
$1,393
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,678 | $2,576 |
$3,285
10,844
kWh
|
$1,393
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs