ITAC Assessment: UD0147
ITAC logo
ITAC Assessment: UD0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PLASTIC MOLDED PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,094 1,686,108
kWh
Natural Gas $98,753 17,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2491: Use cooling air which cools hot work pieces for space heating $5,049 $2,250 - $5,049
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $521 $600 $583
12,309
kWh
$(-62.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,487 $346 $1,902
35,170
kWh
$(-415.0)
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,055 $700 - $5,055
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $588 $680 - $588
-
MMBtu
TOTAL RECOMMENDED $12,700 $4,576 $2,485
47,479
kWh
$10,215
-
MMBtu
TOTAL IMPLEMENTED $12,700 $4,576 $2,485
47,479
kWh
$10,215
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs