ITAC Assessment: OR0250
ITAC logo
ITAC Assessment: OR0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Thermo formed plastics
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 180,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,083 2,372,802
kWh
Natural Gas $35,496 6,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 3.4114: Replace city water with recycled water via cooling tower $16,311 $2,000 $(-1,032.0)
(-34,877)
kWh
$17,343
-
Tgal
02 2.2531: Re-size charging openings or add movable cover or door $5,252 $6,500 $5,252
176,729
kWh
-
03 2.6218: Turn off equipment when not in use $2,300 $600 $2,300
77,374
kWh
-
04 2.4133: Use most efficient type of electric motors $228 $523 $228
6,741
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $365 $2,985 $365
9,086
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $402 $500 $402
10,551
kWh
-
07 2.4224: Upgrade controls on compressors $2,805 $1,830 $2,805
94,373
kWh
-
TOTAL RECOMMENDED $27,663 $14,938 $10,320
339,977
kWh
$17,343
-
Tgal
TOTAL IMPLEMENTED $16,676 $4,985 $(-667.0)
(-25,791)
kWh
$17,343
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs