ITAC Assessment: UD0134
ITAC logo
ITAC Assessment: UD0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WOOD VENEER
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 54,500
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,000 1,699,883
kWh
Wood $38,400 16,512
MMBtu
Other Energy $92,852 24,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Other Energy Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $32,600 $10,000 - - $32,600
-
MMBtu
-
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,306 - - - $3,306
-
MMBtu
-
03 2.1392: Replace purchased steam with other energy source $4,339 $10,000 - $(-1,920.0)
-
MMBtu
$6,259
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,118 $3,218 $1,755
28,429
kWh
- - $1,363
05 2.4131: Size electric motors for peak operating efficiency $230 - $230
4,103
kWh
- - -
TOTAL RECOMMENDED $43,593 $23,218 $1,985
32,532
kWh
$(-1,920.0)
-
MMBtu
$42,165
-
MMBtu
$1,363
TOTAL IMPLEMENTED $40,245 $20,000 - $(-1,920.0)
-
MMBtu
$42,165
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs