Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product GRAY IRON CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 2,500
ton
Production Hrs. Annual 1,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,659 400,645
kWh
Natural Gas $12,401 2,180
MMBtu
Fuel Oil #2 $12,920 1,631
MMBtu
Other Energy $26,640 4,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7244: Revise smoke cleanup from operations $5,989 $1,000 - - $5,989
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,135 $700 $1,135
8,206
kWh
- -
03 2.5194: Redesign process $683 $2,000 - $683
-
MMBtu
-
04 2.7492: Use proper thickness of insulation on building envelope $162 $700 - $162
-
MMBtu
-
TOTAL RECOMMENDED $7,969 $4,400 $1,135
8,206
kWh
$845
-
MMBtu
$5,989
-
MMBtu
TOTAL IMPLEMENTED $7,969 $4,400 $1,135
8,206
kWh
$845
-
MMBtu
$5,989
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs