ITAC Assessment: UD0117
ITAC logo
ITAC Assessment: UD0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product EMBALMING CHEMICALS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 126
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,283 1,102,872
kWh
Natural Gas $71,300 12,114
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,735

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5194: Redesign process $9,920 $18,000 $11,808
132,767
kWh
$(-2,688.0)
-
MMBtu
$800
02 2.4322: Use or replace with energy efficient substitutes $3,837 $2,000 - $3,837
-
MMBtu
-
03 2.7494: Install storm windows and doors $18,493 $22,385 - $18,493
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,694 - - $3,694
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $548 $182 $706
8,206
kWh
$(-158.0)
-
MMBtu
-
TOTAL RECOMMENDED $36,492 $42,567 $12,514
140,973
kWh
$23,178
-
MMBtu
$800
TOTAL IMPLEMENTED $22,735 $22,567 $706
8,206
kWh
$22,029
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs