Assessment Year | 1984 |
---|---|
Principal Product | EMBALMING CHEMICALS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 126 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,283 | 1,102,872 |
kWh
|
$0.096 |
Natural Gas | $71,300 | 12,114 |
MMBtu
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,735 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $9,920 | $18,000 |
$11,808
132,767
kWh
|
$(-2,688.0)
-
MMBtu
|
$800 | |
02 | 2.4322: Use or replace with energy efficient substitutes | $3,837 | $2,000 | - |
$3,837
-
MMBtu
|
- | |
03 | 2.7494: Install storm windows and doors | $18,493 | $22,385 | - |
$18,493
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,694 | - | - |
$3,694
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $548 | $182 |
$706
8,206
kWh
|
$(-158.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $36,492 | $42,567 |
$12,514
140,973
kWh
|
$23,178
-
MMBtu
|
$800 | ||
TOTAL IMPLEMENTED | $22,735 | $22,567 |
$706
8,206
kWh
|
$22,029
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs