ITAC Assessment: UD0113
ITAC logo
ITAC Assessment: UD0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WATER COOLERS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 307
Plant Area
n/a
Annual Production 260,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,148 4,274,619
kWh
Natural Gas $134,843 22,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,926 $62,859 $28,604
446,952
kWh
$(-3,678.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $15,633 $4,906 $2,452
35,756
kWh
$13,181
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $1,847 - $1,053
22,567
kWh
$794
-
MMBtu
04 2.2511: Insulate bare equipment $608 $200 - $608
-
MMBtu
05 2.7226: Use computer programs to optimize hvac performance $13,999 $30,000 $13,999
26,377
kWh
-
TOTAL RECOMMENDED $57,013 $97,965 $46,108
531,652
kWh
$10,905
-
MMBtu
TOTAL IMPLEMENTED $57,013 $97,965 $46,108
531,652
kWh
$10,905
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs