ITAC Assessment: UD0096
ITAC logo
ITAC Assessment: UD0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product GARAGE DOORS AND OPENERS
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,563 1,247,948
kWh
Natural Gas $12,827 2,301
MMBtu
Fuel Oil #2 $4,674 840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $31,335 $45,000 $42,416
432,884
kWh
$(-11,081.0)
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,706 - $1,885
14,068
kWh
$(-179.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,923 $630 $2,076
23,154
kWh
- $(-153.0)
-
MMBtu
04 2.6121: Reduce hot water temperature to the minimum required $476 - $476
5,862
kWh
- -
TOTAL RECOMMENDED $35,440 $45,630 $46,853
475,968
kWh
$(-11,260.0)
-
MMBtu
$(-153.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs