ITAC Assessment: UD0095
ITAC logo
ITAC Assessment: UD0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TOOLS,DIES,SPECIAL MACHINE PARTS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 99
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,165 408,558
kWh
Other Energy $26,586 2,703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.7492: Use proper thickness of insulation on building envelope $9,144 $18,000 - $9,144
-
MMBtu
02 2.1391: Replace purchased steam with electric heating $3,546 $2,000 $(-506.0)
(-6,448)
kWh
$4,052
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $583 $172 $793
9,379
kWh
$(-210.0)
-
MMBtu
04 2.7494: Install storm windows and doors $3,398 $2,560 - $3,398
-
MMBtu
TOTAL RECOMMENDED $16,671 $22,732 $287
2,931
kWh
$16,384
-
MMBtu
TOTAL IMPLEMENTED $13,125 $20,732 $793
9,379
kWh
$12,332
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs