ITAC Assessment: UD0093
ITAC logo
ITAC Assessment: UD0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DISPLAY CASES (BAKERY)
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,388 1,496,776
kWh
Natural Gas $84,239 15,643
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 3.6123: Burn wood by-products for heat $33,271 $53,040 - $40,342
-
MMBtu
$(-7,071.0)
-
MMBtu
02 2.7494: Install storm windows and doors $12,137 $7,918 - $12,137
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,042 $5,758 $4,425
70,926
kWh
$(-383.0)
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $629 $500 - $629
-
MMBtu
-
TOTAL RECOMMENDED $50,079 $67,216 $4,425
70,926
kWh
$52,725
-
MMBtu
$(-7,071.0)
-
MMBtu
TOTAL IMPLEMENTED $16,808 $14,176 $4,425
70,926
kWh
$12,383
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs