ITAC Assessment: OD0112
ITAC logo
ITAC Assessment: OD0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Candles and fragrant soap
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 191,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,170 954,572
kWh
Electricity Demand $22,546 3,922
kW-mo/yr
Electricity Fees $(-1,532.0) -
Natural Gas $22,546 7,061
MMBtu
Fuel Oil #2 $27,753 4,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,048 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,091 $8,577 $2,117
40,152
kWh
$974
-
kW-mo/yr
- - - -
02 2.2113: Repair or replace steam traps $4,912 $990 - - $4,912
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $642 $800 $642
12,309
kWh
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $253 $50 $184
3,517
kWh
$69
-
kW-mo/yr
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,125 $8,000 - - - - $1,125
-
lb
-
06 3.4151: Minimize water usage $105 - - - - $105
-
Tgal
- -
07 4.652: Replace existing equipment with more suitable substitutes $10,920 $550 - - - - - $10,920
TOTAL RECOMMENDED $21,048 $18,967 $2,943
55,978
kWh
$1,043
-
kW-mo/yr
$4,912
-
MMBtu
$105
-
Tgal
$1,125
-
lb
$10,920
TOTAL IMPLEMENTED $10,023 $18,417 $2,943
55,978
kWh
$1,043
-
kW-mo/yr
$4,912
-
MMBtu
- $1,125
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs