Assessment Year | 1983 |
---|---|
Principal Product | ELECTRONIC COMPONENTS |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,401 | 493,552 |
kWh
|
$0.070 |
Natural Gas | $5,618 | 1,182 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,626 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,626 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,108 | $480 |
$1,290
17,292
kWh
|
$(-182.0)
-
MMBtu
|
|
02 | 2.3191: Use demand controller or load shedder | $1,175 | $3,300 |
$1,175
-
kWh
|
- | |
03 | 2.6121: Reduce hot water temperature to the minimum required | $204 | - |
$204
2,931
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $139 | $30 |
$139
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $2,626 | $3,810 |
$2,808
22,275
kWh
|
$(-182.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,626 | $3,810 |
$2,808
22,275
kWh
|
$(-182.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs