ITAC Assessment: UD0084
ITAC logo
ITAC Assessment: UD0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WATER SOFTNERS
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,470
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,563 1,020,809
kWh
Natural Gas $32,583 7,278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,926 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,160 $1,527 $3,465
47,479
kWh
$(-305.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,999 $1,500 $2,095
11,137
kWh
$(-96.0)
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,060 $1,000 $1,629
19,930
kWh
$(-569.0)
-
MMBtu
04 2.7494: Install storm windows and doors $4,907 $6,932 - $4,907
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $2,800 $8,000 - $2,800
-
MMBtu
TOTAL RECOMMENDED $13,926 $18,959 $7,189
78,546
kWh
$6,737
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs