ITAC Assessment: UD0083
ITAC logo
ITAC Assessment: UD0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DISPOSABLE MEDICAL PRODUCTS
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $10
M
to 50
M
# of Employees 314
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,907 3,181,419
kWh
Natural Gas $49,525 10,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,525 $1,420 $5,049
87,925
kWh
$(-524.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $3,112 $1,536 $613
11,137
kWh
$2,499
-
MMBtu
03 2.2422: Use waste heat from hot flue gases to generate steam $19,252 $70,000 - $19,252
-
MMBtu
TOTAL RECOMMENDED $26,889 $72,956 $5,662
99,062
kWh
$21,227
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs