ITAC Assessment: UD0072
ITAC logo
ITAC Assessment: UD0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ALUMINUM BILLETS
NAICS
n/a
SIC 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 39,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,605 5,362,251
kWh
Natural Gas $675,520 153,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,588 $581 $2,993
59,496
kWh
$(-405.0)
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $71,594 $288,000 - $71,594
-
MMBtu
03 2.2437: Recover waste heat from equipment $6,416 $518 $554
9,965
kWh
$5,862
-
MMBtu
04 2.4321: Upgrade obsolete equipment $5,762 $20,000 $5,762
111,079
kWh
-
05 2.6121: Reduce hot water temperature to the minimum required $174 - $174
3,224
kWh
-
06 2.2444: Use hot process fluids to preheat incoming process fluids $88,910 $155,000 $(-2,880.0)
(-51,876)
kWh
$91,790
-
MMBtu
07 2.4321: Upgrade obsolete equipment $17,289 - - $17,289
-
MMBtu
TOTAL RECOMMENDED $192,733 $464,099 $6,603
131,888
kWh
$186,130
-
MMBtu
TOTAL IMPLEMENTED $26,467 $1,099 $3,721
72,685
kWh
$22,746
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs