Assessment Year | 1983 |
---|---|
Principal Product | ALUMINUM BILLETS |
NAICS |
n/a
|
SIC | 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 39,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $274,605 | 5,362,251 |
kWh
|
$0.051 |
Natural Gas | $675,520 | 153,376 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $192,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,467 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,588 | $581 |
$2,993
59,496
kWh
|
$(-405.0)
-
MMBtu
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $71,594 | $288,000 | - |
$71,594
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $6,416 | $518 |
$554
9,965
kWh
|
$5,862
-
MMBtu
|
|
04 | 2.4321: Upgrade obsolete equipment | $5,762 | $20,000 |
$5,762
111,079
kWh
|
- | |
05 | 2.6121: Reduce hot water temperature to the minimum required | $174 | - |
$174
3,224
kWh
|
- | |
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $88,910 | $155,000 |
$(-2,880.0)
(-51,876)
kWh
|
$91,790
-
MMBtu
|
|
07 | 2.4321: Upgrade obsolete equipment | $17,289 | - | - |
$17,289
-
MMBtu
|
|
TOTAL RECOMMENDED | $192,733 | $464,099 |
$6,603
131,888
kWh
|
$186,130
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,467 | $1,099 |
$3,721
72,685
kWh
|
$22,746
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs