Assessment Year 1982
Principal Product ALUMINUM DIE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,150 5,946,952
kWh
Natural Gas $157,722 36,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $594 $158 $784
17,292
kWh
$(-190.0)
-
MMBtu
02 2.1321: Replace fossil fuel equipment with electrical equipment $6,051 $10,000 $(-3,410.0)
(-69,461)
kWh
$9,461
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $13,079 $15,000 - $13,079
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $34,531 $43,000 $(-984.0)
(-19,930)
kWh
$35,515
-
MMBtu
TOTAL RECOMMENDED $54,255 $68,158 $(-3,610.0)
(-72,099)
kWh
$57,865
-
MMBtu
TOTAL IMPLEMENTED $19,130 $25,000 $(-3,410.0)
(-69,461)
kWh
$22,540
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs