| Assessment Year | 1982 |
|---|---|
| Principal Product | ALUMINUM DIE CASTINGS |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 135 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $264,150 | 5,946,952 |
kWh
|
$0.044 |
| Natural Gas | $157,722 | 36,886 |
MMBtu
|
$4.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,130 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $594 | $158 |
$784
17,292
kWh
|
$(-190.0)
-
MMBtu
|
|
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $6,051 | $10,000 |
$(-3,410.0)
(-69,461)
kWh
|
$9,461
-
MMBtu
|
|
| 03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $13,079 | $15,000 | - |
$13,079
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $34,531 | $43,000 |
$(-984.0)
(-19,930)
kWh
|
$35,515
-
MMBtu
|
|
| TOTAL RECOMMENDED | $54,255 | $68,158 |
$(-3,610.0)
(-72,099)
kWh
|
$57,865
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $19,130 | $25,000 |
$(-3,410.0)
(-69,461)
kWh
|
$22,540
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs