ITAC Assessment: UD0060
ITAC logo
ITAC Assessment: UD0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HANDTOOLS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,349 3,728,898
kWh
Natural Gas $21,617 4,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,603 $4,366 $5,634
108,148
kWh
$(-1,031.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,089 $1,000 $1,542
29,015
kWh
$(-453.0)
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $9,604 $139,500 - $9,604
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,230 $46,000 $45,178
849,941
kWh
$(-16,948.0)
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $618 - - $618
-
MMBtu
TOTAL RECOMMENDED $44,144 $190,866 $52,354
987,104
kWh
$(-8,210.0)
-
MMBtu
TOTAL IMPLEMENTED $34,540 $51,366 $52,354
987,104
kWh
$(-17,814.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs