| Assessment Year | 1982 |
|---|---|
| Principal Product | HANDTOOLS |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 290 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $187,349 | 3,728,898 |
kWh
|
$0.050 |
| Natural Gas | $21,617 | 4,877 |
MMBtu
|
$4.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,144 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,540 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,603 | $4,366 |
$5,634
108,148
kWh
|
$(-1,031.0)
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,089 | $1,000 |
$1,542
29,015
kWh
|
$(-453.0)
-
MMBtu
|
|
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $9,604 | $139,500 | - |
$9,604
-
MMBtu
|
|
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $28,230 | $46,000 |
$45,178
849,941
kWh
|
$(-16,948.0)
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $618 | - | - |
$618
-
MMBtu
|
|
| TOTAL RECOMMENDED | $44,144 | $190,866 |
$52,354
987,104
kWh
|
$(-8,210.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $34,540 | $51,366 |
$52,354
987,104
kWh
|
$(-17,814.0)
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs