ITAC Assessment: UD0057
ITAC logo
ITAC Assessment: UD0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SPECIAL IND. MECHINERY
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 72
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,990
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,092 344,959
kWh
LPG $2,151 256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $422 $140 $443
7,327
kWh
- $(-21.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,865 $5,000 $8,298
84,115
kWh
$(-1,433.0)
-
MMBtu
-
03 2.6121: Reduce hot water temperature to the minimum required $153 - $153
4,982
kWh
- -
TOTAL RECOMMENDED $7,440 $5,140 $8,894
96,424
kWh
$(-1,433.0)
-
MMBtu
$(-21.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs