ITAC Assessment: NC0627
ITAC logo
ITAC Assessment: NC0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Adhesive tapes
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 179
Plant Area 166,200
ft2
Annual Production 1,026,000
units
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,493 5,854,928
kWh
Electricity Demand $97,274 8,649
kW-mo/yr
Natural Gas $176,242 32,844
MMBtu
TOTAL YEARLY COSTS $495,009
RECOMMENDED SAVINGS* $56,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,799 $71,461 $13,822
365,656
kWh
$6,977
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,085 $345 $2,407
63,672
kWh
$1,023
-
kW-mo/yr
- $(-300.0) $(-45.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $925 $100 $649
17,177
kWh
$276
-
kW-mo/yr
- - -
04 2.8114: Change rate schedules or other changes in utility service $28,232 $500 $28,232
-
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,215 - - - $4,215
-
MMBtu
- $(-1,000.0)
TOTAL RECOMMENDED $56,256 $72,406 $45,110
446,505
kWh
$8,276
-
kW-mo/yr
$4,215
-
MMBtu
$(-300.0) $(-1,045.0)
TOTAL IMPLEMENTED $55,331 $72,306 $44,461
429,328
kWh
$8,000
-
kW-mo/yr
$4,215
-
MMBtu
$(-300.0) $(-1,045.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs