Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,493 | 5,854,928 |
kWh
|
$0.038 |
Electricity Demand | $97,274 | 8,649 |
kW-mo/yr
|
$11.25 |
Natural Gas | $176,242 | 32,844 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | $495,009 | |||
RECOMMENDED SAVINGS* | $56,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,331 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,799 | $71,461 |
$13,822
365,656
kWh
|
$6,977
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,085 | $345 |
$2,407
63,672
kWh
|
$1,023
-
kW-mo/yr
|
- | $(-300.0) | $(-45.0) | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $925 | $100 |
$649
17,177
kWh
|
$276
-
kW-mo/yr
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $28,232 | $500 |
$28,232
-
kWh
|
- | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,215 | - | - | - |
$4,215
-
MMBtu
|
- | $(-1,000.0) | |
TOTAL RECOMMENDED | $56,256 | $72,406 |
$45,110
446,505
kWh
|
$8,276
-
kW-mo/yr
|
$4,215
-
MMBtu
|
$(-300.0) | $(-1,045.0) | ||
TOTAL IMPLEMENTED | $55,331 | $72,306 |
$44,461
429,328
kWh
|
$8,000
-
kW-mo/yr
|
$4,215
-
MMBtu
|
$(-300.0) | $(-1,045.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs