ITAC Assessment: UD0051
ITAC logo
ITAC Assessment: UD0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HYDRAULIC TUBE FITTINGS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 328
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,908 6,616,061
kWh
Natural Gas $46,078 11,875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $460 - $460
3,810
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,295 $753 $3,295
70,340
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $4,219 $6,160 - $4,219
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,504 $900 - $4,504
-
MMBtu
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,312 $1,500 - $3,312
-
MMBtu
TOTAL RECOMMENDED $15,790 $9,313 $3,755
74,150
kWh
$12,035
-
MMBtu
TOTAL IMPLEMENTED $12,478 $7,813 $3,755
74,150
kWh
$8,723
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs