ITAC Assessment: UD0049
ITAC logo
ITAC Assessment: UD0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BUSBARS & HOUSING
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,808 1,918,230
kWh
Natural Gas $103,493 27,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,138 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,138

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,155 $320 $2,155
36,928
kWh
-
02 2.6121: Reduce hot water temperature to the minimum required $773 - $773
15,533
kWh
-
03 2.7421: Reduce glazed areas in buildings $28,537 $40,346 - $28,537
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $14,665 $163,485 - $14,665
-
MMBtu
05 2.5195: Change product design to reduce energy requirements $7,008 $7,500 - $7,008
-
MMBtu
TOTAL RECOMMENDED $53,138 $211,651 $2,928
52,461
kWh
$50,210
-
MMBtu
TOTAL IMPLEMENTED $53,138 $211,651 $2,928
52,461
kWh
$50,210
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs