ITAC Assessment: UD0047
ITAC logo
ITAC Assessment: UD0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MEN'S/WOMEN'S SUITS
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $5
M
to 10
M
# of Employees 330
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 1,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,247 1,002,345
kWh
Natural Gas $51,204 13,859
MMBtu
Fuel Oil #2 $4,600 700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,843 $600 - $3,600
-
MMBtu
$243
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,175 $122 $2,440
27,843
kWh
$(-265.0)
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $4,878 $2,288 $2,362
24,033
kWh
$2,516
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $1,352 $1,500 $678
6,741
kWh
$674
-
MMBtu
-
05 2.7494: Install storm windows and doors $5,066 $6,048 - $5,066
-
MMBtu
-
TOTAL RECOMMENDED $17,314 $10,558 $5,480
58,617
kWh
$11,591
-
MMBtu
$243
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs