ITAC Assessment: UD0038
ITAC logo
ITAC Assessment: UD0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product LAWN & GARDEN EQUIPMENT
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $5
M
to 10
M
# of Employees 91
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,100
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,095 593,494
kWh
Natural Gas $39,717 10,854
MMBtu
Fuel Oil #2 $10,000 1,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,301 $50 $2,301
30,188
kWh
-
02 2.6121: Reduce hot water temperature to the minimum required $721 - $721
9,379
kWh
-
03 2.6224: Schedule baking times of small and large components $3,584 $1,500 $3,584
24,033
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,327 $300 $1,196
15,826
kWh
$131
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $3,854 $10,000 - $3,854
-
MMBtu
TOTAL RECOMMENDED $11,787 $11,850 $7,802
79,426
kWh
$3,985
-
MMBtu
TOTAL IMPLEMENTED $11,787 $11,850 $7,802
79,426
kWh
$3,985
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs