ITAC Assessment: UD0029
ITAC logo
ITAC Assessment: UD0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product METAL FINISHING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,427 1,234,174
kWh
Natural Gas $90,162 25,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,289 $500 - $1,289
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $972 - $972
-
kWh
-
03 2.2136: Install / repair insulation on steam lines $7,697 $5,000 - $7,697
-
MMBtu
TOTAL RECOMMENDED $9,958 $5,500 $972
-
kWh
$8,986
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs