Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PAINT AND AEROSOL CANS
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 2,000
Tgal
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,089 1,964,830
kWh
Fuel Oil #2 $25,117 10,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,141 $45 $1,141
27,550
kWh
- -
02 2.2437: Recover waste heat from equipment $2,497 $700 $2,497
60,375
kWh
- -
03 2.1332: Convert combustion equipment to burn natural gas $39,185 $33,000 - $(-59,016.0)
-
MMBtu
$98,201
-
MMBtu
TOTAL RECOMMENDED $42,823 $33,745 $3,638
87,925
kWh
$(-59,016.0)
-
MMBtu
$98,201
-
MMBtu
TOTAL IMPLEMENTED $40,326 $33,045 $1,141
27,550
kWh
$(-59,016.0)
-
MMBtu
$98,201
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs