Assessment Year | 1981 |
---|---|
Principal Product | INDUSTRIAL MAINTANENCE PRODUCTS |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,032
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,858 | 271,688 |
kWh
|
$0.069 |
Fuel Oil #2 | $33,951 | 4,647 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,608 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $539 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $610 | $45 |
$610
8,792
kWh
|
- | - | |
02 | 2.1332: Convert combustion equipment to burn natural gas | $9,469 | $32,000 | - |
$(-13,492.0)
-
MMBtu
|
$22,961
-
MMBtu
|
|
03 | 2.2515: Use optimum thickness insulation | $445 | - |
$445
6,448
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $94 | $60 |
$94
1,172
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $10,990 | $10,000 | - | - |
$10,990
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,608 | $42,105 |
$1,149
16,412
kWh
|
$(-13,492.0)
-
MMBtu
|
$33,951
-
MMBtu
|
||
TOTAL IMPLEMENTED | $539 | $60 |
$539
7,620
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs