ITAC Assessment: UC2205
ITAC logo
ITAC Assessment: UC2205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 58,600
ft2
Annual Production 2,920,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,627 4,782,240
kWh
Electricity Demand $131,825 7,804
kW-mo/yr
Electricity Fees $13,065 -
Natural Gas $37,272 3,911
MMBtu
TOTAL YEARLY COSTS $632,789
RECOMMENDED SAVINGS* $373,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,071 $2,641 $947
10,050
kWh
$1,019
-
kW-mo/yr
- $44 - $61
02 2.3192: Use fossil fuel powered generator during peak demand periods $19,018 - $1,332
14,138
kWh
$4,898
-
kW-mo/yr
$21,750 $(-8,962.2) - -
03 2.6231: Utilize controls to operate equipment only when needed $3,990 $500 $3,085
32,754
kWh
$904
-
kW-mo/yr
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $2,840 $500 $2,283
24,235
kWh
$557
-
kW-mo/yr
- - - -
05 2.9114: Use solar heat to make electricty $279,536 $1,875,313 $222,382
2,360,744
kWh
$88,774
-
kW-mo/yr
- - $(-31,620.0) -
06 2.3141: Use battery storage for demand control $65,817 $383,577 $(-9,233.0)
(-98,013)
kWh
$81,072
-
kW-mo/yr
- - $(-6,021.7) -
TOTAL RECOMMENDED $373,272 $2,262,531 $220,796
2,343,908
kWh
$177,224
-
kW-mo/yr
$21,750 $(-8,917.9) $(-37,641.7) $61
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs