ITAC Assessment: UC2204
ITAC logo
ITAC Assessment: UC2204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $500
k
to 1
M
# of Employees 5
Plant Area 35,000
ft2
Annual Production 5,475,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,078 2,483,108
kWh
Electricity Demand $116,215 7,394
kW-mo/yr
Electricity Fees $1,002 -
TOTAL YEARLY COSTS $391,295
RECOMMENDED SAVINGS* $181,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $3,299 $4,273 $2,166
19,626
kWh
$802
-
kW-mo/yr
$107 - $224
02 2.7134: Use photocell controls $198 $567 $174
1,579
kWh
- $9 - $15
03 2.7232: Replace existing hvac unit with high efficiency model $53,116 $251,956 $27,594
249,989
kWh
$3,490
-
kW-mo/yr
- $22,032 -
04 2.9114: Use solar heat to make electricty $94,985 $434,038 $71,642
649,048
kWh
$31,880
-
kW-mo/yr
- $(-8,537.0) -
05 2.3141: Use battery storage for demand control $29,630 $180,317 $(-6,340.0)
(-57,437)
kWh
$41,055
-
kW-mo/yr
- $(-5,085.0) -
TOTAL RECOMMENDED $181,228 $871,151 $95,236
862,805
kWh
$77,227
-
kW-mo/yr
$116 $8,410 $239
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs