ITAC Assessment: UA3031
ITAC logo
ITAC Assessment: UA3031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 100,000
ft2
Annual Production 13,500
thousand feet
Production Hrs. Annual 2,448
hrs
Location (State) Alabama
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,163 3,048,228
kWh
Electricity Demand $0.0 15,122
kW-mo/yr
Electricity Fees $10,708 -
Natural Gas $752 40
MMBtu
Wood $0.0 61,606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Wood Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,783 $400 $1,743
22,398
kWh
$40 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,389 $7,400 $13,091
168,261
kWh
$298 -
03 2.1113: Reduce combustion air flow to optimum $3,045 $23,550 - - $3,045
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $174 $3,355 - - $174
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $85 $609 - - $85
-
MMBtu
06 4.454: Modify startup/shutdown times $15,087 - - $15,087 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,270 $1,654 $3,197
41,087
kWh
$73 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,244 $4,074 $2,194
28,201
kWh
$50 -
09 2.7135: Install occupancy sensors $362 $763 $354
4,548
kWh
$8 -
TOTAL RECOMMENDED $39,439 $41,805 $20,579
264,495
kWh
$15,556 $3,304
-
MMBtu
TOTAL IMPLEMENTED $23,731 $37,078 $20,225
259,947
kWh
$461 $3,045
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs