Assessment Year | 2013 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 44 |
Plant Area |
100,000
ft2
|
Annual Production | 13,500
thousand feet
|
Production Hrs. Annual | 2,448
hrs
|
Location (State) | Alabama |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,163 | 3,048,228 |
kWh
|
$0.078 |
Electricity Demand | $0.0 | 15,122 |
kW-mo/yr
|
$0.000 |
Electricity Fees | $10,708 | - |
|
- |
Natural Gas | $752 | 40 |
MMBtu
|
$19.04 |
Wood | $0.0 | 61,606 |
MMBtu
|
$0.000 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,731 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,783 | $400 |
$1,743
22,398
kWh
|
$40 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,389 | $7,400 |
$13,091
168,261
kWh
|
$298 | - | |
03 | 2.1113: Reduce combustion air flow to optimum | $3,045 | $23,550 | - | - |
$3,045
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $174 | $3,355 | - | - |
$174
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $85 | $609 | - | - |
$85
-
MMBtu
|
|
06 | 4.454: Modify startup/shutdown times | $15,087 | - | - | $15,087 | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,270 | $1,654 |
$3,197
41,087
kWh
|
$73 | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,244 | $4,074 |
$2,194
28,201
kWh
|
$50 | - | |
09 | 2.7135: Install occupancy sensors | $362 | $763 |
$354
4,548
kWh
|
$8 | - | |
TOTAL RECOMMENDED | $39,439 | $41,805 |
$20,579
264,495
kWh
|
$15,556 |
$3,304
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,731 | $37,078 |
$20,225
259,947
kWh
|
$461 |
$3,045
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs