| Assessment Year | 2013 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $5 M to 10M |
| # of Employees | 44 |
| Plant Area |
100,000
ft2
|
| Annual Production | 13,500
thousand feet
|
| Production Hrs. Annual | 2,448
hrs
|
| Location (State) | Alabama |
| View Case Study | |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $237,163 | 3,048,228 |
kWh
|
$0.078 |
| Electricity Demand | $0.0 | 15,122 |
kW-mo/yr
|
$0.000 |
| Electricity Fees | $10,708 | - |
|
- |
| Natural Gas | $752 | 40 |
MMBtu
|
$19.04 |
| Wood | $0.0 | 61,606 |
MMBtu
|
$0.000 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,731 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Wood Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,783 | $400 |
$1,743
22,398
kWh
|
$40 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,389 | $7,400 |
$13,091
168,261
kWh
|
$298 | - | |
| 03 | 2.1113: Reduce combustion air flow to optimum | $3,045 | $23,550 | - | - |
$3,045
-
MMBtu
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $174 | $3,355 | - | - |
$174
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $85 | $609 | - | - |
$85
-
MMBtu
|
|
| 06 | 4.454: Modify startup/shutdown times | $15,087 | - | - | $15,087 | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,270 | $1,654 |
$3,197
41,087
kWh
|
$73 | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,244 | $4,074 |
$2,194
28,201
kWh
|
$50 | - | |
| 09 | 2.7135: Install occupancy sensors | $362 | $763 |
$354
4,548
kWh
|
$8 | - | |
| TOTAL RECOMMENDED | $39,439 | $41,805 |
$20,579
264,495
kWh
|
$15,556 |
$3,304
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,731 | $37,078 |
$20,225
259,947
kWh
|
$461 |
$3,045
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs