Assessment Year | 2013 |
---|---|
Principal Product | Floor Coverings |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
400,000
ft2
|
Annual Production | 36,000
thousand feet
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $784,417 | 12,396,800 |
kWh
|
$0.063 |
Electricity Demand | $569,565 | 52,264 |
kW-mo/yr
|
$10.90 |
Electricity Fees | $(-135,873.0) | - |
|
- |
Natural Gas | $87,079 | 18,973 |
MMBtu
|
$4.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,215 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,215 | $5,595 |
$24,794
391,809
kWh
|
- | $(-2,579.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,021 | $6,562 |
$3,096
48,922
kWh
|
$1,374
-
kW-mo/yr
|
$(-449.0) | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,307 | $1,000 |
$2,565
40,534
kWh
|
- | $(-258.0) | |
04 | 2.1116: Improve combustion control capability | $16,926 | $2,300 | - |
$16,926
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $45,469 | $15,457 |
$30,455
481,265
kWh
|
$18,300
-
kW-mo/yr
|
$(-3,286.0) | ||
TOTAL IMPLEMENTED | $22,215 | $5,595 |
$24,794
391,809
kWh
|
- | $(-2,579.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs