ITAC Assessment: UA3028
ITAC logo
ITAC Assessment: UA3028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Floor Coverings
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 400,000
ft2
Annual Production 36,000
thousand feet
Production Hrs. Annual 4,900
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $784,417 12,396,800
kWh
Electricity Demand $569,565 52,264
kW-mo/yr
Electricity Fees $(-135,873.0) -
Natural Gas $87,079 18,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,215 $5,595 $24,794
391,809
kWh
- $(-2,579.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,021 $6,562 $3,096
48,922
kWh
$1,374
-
kW-mo/yr
$(-449.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,307 $1,000 $2,565
40,534
kWh
- $(-258.0)
04 2.1116: Improve combustion control capability $16,926 $2,300 - $16,926
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,469 $15,457 $30,455
481,265
kWh
$18,300
-
kW-mo/yr
$(-3,286.0)
TOTAL IMPLEMENTED $22,215 $5,595 $24,794
391,809
kWh
- $(-2,579.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs