Assessment Year | 2012 |
---|---|
Principal Product | Steel Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
135,000
ft2
|
Annual Production | 88,000,000
pieces
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $616,676 | 9,909,900 |
kWh
|
$0.062 |
Electricity Demand | $231,325 | 22,346 |
kW-mo/yr
|
$10.35 |
Electricity Fees | $(-90,089.0) | - |
|
- |
Natural Gas | $179,096 | 26,585 |
MMBtu
|
$6.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,673 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $35,953 | $25,000 |
$29,976
481,694
kWh
|
$9,253
-
kW-mo/yr
|
$(-3,276.0) | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,898 | $9,195 |
$10,150
163,103
kWh
|
$2,857
-
kW-mo/yr
|
$(-1,109.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $24,967 | $800 |
$20,315
335,822
kWh
|
$6,872
-
kW-mo/yr
|
$(-2,220.0) | - | |
04 | 2.7135: Install occupancy sensors | $1,775 | $2,010 |
$1,993
32,028
kWh
|
- | $(-218.0) | - | |
05 | 2.2515: Use optimum thickness insulation | $1,260 | $1,155 | - | - | - |
$1,260
-
MMBtu
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,818 | $879 |
$1,524
24,475
kWh
|
$450
-
kW-mo/yr
|
$(-156.0) | - | |
TOTAL RECOMMENDED | $77,671 | $39,039 |
$63,958
1,037,122
kWh
|
$19,432
-
kW-mo/yr
|
$(-6,979.0) |
$1,260
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,673 | $11,205 |
$12,143
195,131
kWh
|
$2,857
-
kW-mo/yr
|
$(-1,327.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs