ITAC Assessment: UA3019
ITAC logo
ITAC Assessment: UA3019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Fats and Oils
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 230,000
ft2
Annual Production 306,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,059,951 19,431,000
kWh
Electricity Demand $202,337 42,312
kW-mo/yr
Electricity Fees $64,139 -
Natural Gas $691,645 85,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $410,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $187,856 $297,985 - - $3,448 $184,408
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,559 $12,491 $4,799
87,966
kWh
$688
-
kW-mo/yr
$72 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,076 $11,695 $14,796
271,237
kWh
$1,754
-
kW-mo/yr
$526 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $9,814 $800 $8,939
163,856
kWh
$573
-
kW-mo/yr
$302 -
05 2.2511: Insulate bare equipment $10,114 $16,643 $9,802
179,703
kWh
- $312 -
06 2.2511: Insulate bare equipment $31,634 $18,198 - - $581 $31,053
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $11,310 $10,991 - - $208 $11,102
-
MMBtu
08 2.2511: Insulate bare equipment $2,412 $1,248 - - $44 $2,368
-
MMBtu
09 2.2414: Use waste heat from hot flue gases to preheat $99,802 $195,000 - - $1,832 $97,970
-
MMBtu
10 2.1116: Improve combustion control capability $28,009 $90,000 - - $514 $27,495
-
MMBtu
11 2.2135: Repair and eliminate steam leaks $4,250 $4,060 - - $78 $4,172
-
MMBtu
12 2.1113: Reduce combustion air flow to optimum $2,737 $800 - - $50 $2,687
-
MMBtu
TOTAL RECOMMENDED $410,573 $659,911 $38,336
702,762
kWh
$3,015
-
kW-mo/yr
$7,967 $361,255
-
MMBtu
TOTAL IMPLEMENTED $39,416 $30,386 $33,537
614,796
kWh
$2,327
-
kW-mo/yr
$1,184 $2,368
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs