| Assessment Year | 2026 |
|---|---|
| Principal Product | Automotive Metal Parts |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
230,000
ft2
|
| Annual Production | 4,276,422
units
|
| Production Hrs. Annual | 1,920
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $412,971 | 5,171,410 |
kWh
|
$0.080 |
| Electricity Fees | $66,295 | - |
|
- |
| Natural Gas | $27,499 | 2,114 |
MMBtu
|
$13.01 |
| TOTAL YEARLY COSTS | $506,765 | |||
| RECOMMENDED SAVINGS* | $92,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $668 | $500 |
$454
5,681
kWh
|
$137
-
kW-mo/yr
|
$77 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $730 | $3,591 |
$535
6,696
kWh
|
$111
-
kW-mo/yr
|
$84 | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $10,945 | $76,614 |
$8,204
102,677
kWh
|
$1,485
-
kW-mo/yr
|
$1,256 | |
| 04 | 2.7135: Install occupancy sensors | $1,277 | $753 |
$1,130
14,168
kWh
|
- | $147 | |
| 05 | 2.9114: Use solar heat to make electricty | $62,395 | $858,780 |
$53,085
664,392
kWh
|
$2,151
-
kW-mo/yr
|
$7,159 | |
| 06 | 2.3212: Optimize plant power factor | $16,102 | $5,470 | - |
$14,255
-
kW-mo/yr
|
$1,847 | |
| TOTAL RECOMMENDED | $92,117 | $945,708 |
$63,408
793,614
kWh
|
$18,139
-
kW-mo/yr
|
$10,570 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs