ITAC Assessment: UA0302
ITAC logo
ITAC Assessment: UA0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Automotive Metal Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 230,000
ft2
Annual Production 4,276,422
units
Production Hrs. Annual 1,920
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,971 5,171,410
kWh
Electricity Fees $66,295 -
Natural Gas $27,499 2,114
MMBtu
TOTAL YEARLY COSTS $506,765
RECOMMENDED SAVINGS* $92,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $668 $500 $454
5,681
kWh
$137
-
kW-mo/yr
$77
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $730 $3,591 $535
6,696
kWh
$111
-
kW-mo/yr
$84
03 2.7232: Replace existing hvac unit with high efficiency model $10,945 $76,614 $8,204
102,677
kWh
$1,485
-
kW-mo/yr
$1,256
04 2.7135: Install occupancy sensors $1,277 $753 $1,130
14,168
kWh
- $147
05 2.9114: Use solar heat to make electricty $62,395 $858,780 $53,085
664,392
kWh
$2,151
-
kW-mo/yr
$7,159
06 2.3212: Optimize plant power factor $16,102 $5,470 - $14,255
-
kW-mo/yr
$1,847
TOTAL RECOMMENDED $92,117 $945,708 $63,408
793,614
kWh
$18,139
-
kW-mo/yr
$10,570
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs