ITAC Assessment: UA0291
ITAC logo
ITAC Assessment: UA0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hydraulic Cylinders
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 140,000
ft2
Annual Production 9,928
units
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,966 3,788,039
kWh
Electricity Demand $211,394 15,244
kW-mo/yr
Electricity Fees $17,255 -
Natural Gas $41,855 4,105
MMBtu
Waste Disposal Costs
Water Usage $12,808 3,723
Tgal
TOTAL YEARLY COSTS $553,278
RECOMMENDED SAVINGS* $192,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,753 $500 $1,485
20,831
kWh
$1,173
-
kW-mo/yr
$95
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,693 $8,473 $5,929
83,151
kWh
$3,429
-
kW-mo/yr
$335
03 2.7232: Replace existing hvac unit with high efficiency model $178,998 $1,000,734 $64,278
901,514
kWh
$108,533
-
kW-mo/yr
$6,187
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $531 $1,463 $237
3,318
kWh
$276
-
kW-mo/yr
$18
05 2.7142: Utilize higher efficiency lamps and/or ballasts $688 $3,738 $303
4,256
kWh
$361
-
kW-mo/yr
$24
06 2.7135: Install occupancy sensors $107 $452 $103
1,440
kWh
- $4
TOTAL RECOMMENDED $192,770 $1,015,360 $72,335
1,014,510
kWh
$113,772
-
kW-mo/yr
$6,663
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs