ITAC Assessment: UA0280
ITAC logo
ITAC Assessment: UA0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 5
Plant Area 37,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 2,722
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,764 644,570
kWh
Electricity Demand $21,979 4,637
kW-mo/yr
Electricity Fees $5,228 -
Natural Gas $434,987 70,697
MMBtu
TOTAL YEARLY COSTS $556,958
RECOMMENDED SAVINGS* $8,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $4,338 $353 - $4,152
-
kW-mo/yr
$186
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,180 $3,163 $998
6,789
kWh
$131
-
kW-mo/yr
$51
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,472 $1,000 $1,221
8,304
kWh
$188
-
kW-mo/yr
$63
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,752 $7,431 $1,578
10,732
kWh
$143
-
kW-mo/yr
$31
TOTAL RECOMMENDED $8,742 $11,947 $3,797
25,825
kWh
$4,614
-
kW-mo/yr
$331
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs