Assessment Year | 2024 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 5 |
Plant Area |
37,000
ft2
|
Annual Production | 300,000
ton
|
Production Hrs. Annual | 2,722
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,764 | 644,570 |
kWh
|
$0.15 |
Electricity Demand | $21,979 | 4,637 |
kW-mo/yr
|
$4.74 |
Electricity Fees | $5,228 | - |
|
- |
Natural Gas | $434,987 | 70,697 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | $556,958 | |||
RECOMMENDED SAVINGS* | $8,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $4,338 | $353 | - |
$4,152
-
kW-mo/yr
|
$186 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,180 | $3,163 |
$998
6,789
kWh
|
$131
-
kW-mo/yr
|
$51 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,472 | $1,000 |
$1,221
8,304
kWh
|
$188
-
kW-mo/yr
|
$63 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,752 | $7,431 |
$1,578
10,732
kWh
|
$143
-
kW-mo/yr
|
$31 | |
TOTAL RECOMMENDED | $8,742 | $11,947 |
$3,797
25,825
kWh
|
$4,614
-
kW-mo/yr
|
$331 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs