ITAC Assessment: UA0265
ITAC logo
ITAC Assessment: UA0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hamburger Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 127
Plant Area 67,000
ft2
Annual Production 41,600,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,652 6,917,877
kWh
Electricity Demand $76,953 12,784
kW-mo/yr
Electricity Fees $72,789 -
Natural Gas $346,197 27,813
MMBtu
TOTAL YEARLY COSTS $913,591
RECOMMENDED SAVINGS* $63,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $7,134 $400 $5,424
89,799
kWh
$795
-
kW-mo/yr
$915 -
02 2.7232: Replace existing hvac unit with high efficiency model $4,737 $23,601 $2,973
49,214
kWh
$1,156
-
kW-mo/yr
$608 -
03 2.3212: Optimize plant power factor $14,987 $4,205 - - $14,987 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,413 $5,533 $2,617
43,336
kWh
$358
-
kW-mo/yr
$438 -
05 2.2414: Use waste heat from hot flue gases to preheat $33,503 $34,984 - - - $33,503
-
MMBtu
TOTAL RECOMMENDED $63,774 $68,723 $11,014
182,349
kWh
$2,309
-
kW-mo/yr
$16,948 $33,503
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs