ITAC Assessment: UA0262
ITAC logo
ITAC Assessment: UA0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Automotive Trim
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 293,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $767,332 13,235,611
kWh
Electricity Demand $122,149 29,821
kW-mo/yr
Electricity Fees $71,163 -
Natural Gas $1,836 124
MMBtu
TOTAL YEARLY COSTS $962,480
RECOMMENDED SAVINGS* $59,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $46,023 $44,464 $37,494
646,789
kWh
$5,120
-
kW-mo/yr
$3,409
02 2.7135: Install occupancy sensors $2,699 $2,060 $2,499
43,110
kWh
- $200
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,104 $4,929 $3,470
59,865
kWh
$330
-
kW-mo/yr
$304
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,910 $400 $5,767
99,475
kWh
$631
-
kW-mo/yr
$512
TOTAL RECOMMENDED $59,736 $51,853 $49,230
849,239
kWh
$6,081
-
kW-mo/yr
$4,425
TOTAL IMPLEMENTED $52,826 $51,453 $43,463
749,764
kWh
$5,450
-
kW-mo/yr
$3,913
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs